1

Advanced 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Summary Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation boosts process efficiency while cutting overall power consumption and CO₂ discharge. https://express-page.com/story6155208/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-energy-savings-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story