Installation Overview Newsome has recently completed the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. This initiative reflects a strategic step forward in the client’s ESG commitments, enhancing operational resilience and delivering measurable decreases in both energy consumption and carbon footprint. https://bouchesocial.com/story22920739/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction